Références

Estonian Road Administration’s pilot project T22 Torma- Levala Overlay

For Estonian Road Authorities Tugimaantee 22 Tõrma-Levala -road improvement – 7,2 km of AC16surf overlay with a combination of leveling layers and milling – was the first pilot project in BIM (Building Information Management).

Lire plus »
 
Improving the stability of Luoma railway embankment

The process of improving the stability of the Luoma railway embankment started in October 2018 and will be completed by 31st of July 2019. The project includes improving the stability of the embankment by installing walls of interconnected columns and piping existing ditches

Lire plus »
Klaukkala bypass MT 132: Design and Construction Cooperation

The construction of the Klaukkala bypass was started in February 2019 and the road is planned to be completed in autumn 2021. The new bypass is intended to ease the congestion of Klaukkala and to increase traffic safety

Lire plus »
Case: E18 Hamina-Vaalimaa project was completed ahead of time

Almost two years ago we wrote about YIT Rakennus Oy’s project E18 Hamina-Vaalimaa. The project was still in its infancy and Infrakit was in use in every five subprojects of the enormous 32 km project.

Lire plus »
Cas: Ydalir – La ville du futur à Elverum, en Norvège

Lire plus »
Upgrading highway 4 between Kello-Räinänperä, Oulu and Ii

The work to upgrade highway 4 starts at the ending point of the highway in the intersection bridge in Korvala and ends in the municipality of Ii 500 meters north from the motorway 847 intersection in Haukiputaantie. In the project, 18 km of highway 4 is upgraded.

Lire plus »
Projet de construction de la route E6 Arnkvern-Moelv en Norvège

En novembre 2017, Veidekke AS a remporté le marché pour la construction de la route Arnkvern-Moelv. Le projet est gigantesque et consiste en la construction de 24 km d’autoroute à quatre voies, comprenant plusieurs ponts, deux ponts de chemin de fer et deux tunnels courts.

Lire plus »

1 3 4 5 6